How we work?
Every lighting design follows five steps, based on the RIBA Plan of Work, the framework architects and builders use. It keeps us in step with your wider team, from first idea to final detail.
1. Initial Consultation (RIBA Stage 0-1)
We listen first. We talk through your brief, priorities, budget and timeline, then turn it into a clear, costed fee proposal. No charge, so you know where you stand before committing.
2. Concept Study (RIBA Stage 2)
We explore the lighting approach for each space and present it through mood boards. Together we agree fixtures, effects, control approach, budgets and timescales.
3. Developed Design (RIBA Stage 3)
The concept is developed in 2D CAD, coordinated with your interiors package. Circuiting, specification and bespoke details are set out, with control and loading information for your electrical designer. It ends with a tender package, so contractors can price with confidence.
4. Technical Design (RIBA Stage 4)
We agree any final changes, then produce construction level drawings, specifications and control schedules. The full package is issued to the project team.
5. Construction (RIBA Stage 5)
We support the installation on site, answer queries and snag the works. Finally, we commission the scheme, overseeing control programming and luminaire focusing, so the lighting performs as designed.